1891 - World's First AC Electric Service Established Near Ophir, Colorado

Location: Ophir, San Juan Mountains of southwest Colorado, United States.

Event: Alternating Current (AC) electric power transmitted a significant distance over wires for the first time anywhere.

Source of AC electricity: A new hydroelectric power generating station at Ames.

Destination: Gold King Mine near Ophir, about 2.5 miles from Ames.

Another AC hydroelectric generator at Bridal Veil Falls, built in 1895, electrified the nearby the Smuggler-Union Mine and the mining town of Telluride.

Ames hydroelectric generating station - October 2017. Linecurrents photo.

grid, tech-R&DAllyn Svoboda